Setting up a new schedule from scratch is surprisingly easy.

  • Go into "Edit" mode.
  • Select the "dispatcher" window
  • Select "Create schedule" from the "schedule" menu. A new schedule will be added to the list of schedules.
  • Double click on it, and give it a name.
  • If you have a control panel, click "record" on the "start-dest" tab; then press the start and destination buttons on the control panel. They are picked up into the schedule definition.
  • Close the properties editor.
  • Select "pick from block diagram" from the "tools" menu
  • Click on all of the blocks forming the route; they are added.
  • If there are several blocks in passing loops that could be used - e.g. in 5 roads at the fiddle yard - select all of them.
  • It is also necessary to select the routes between the blocks; click on them. Where there are overlapping routes - for example where there are complex junctions - select them from the "routes" tab in the dispatcher window.
  • Right click on the start & end blocks and assign them to be start & end, with a direction assigned (depart for start block, arrive for destination).

And that's all that is necessary to make a working schedule. There are some rules that can be changed:

  • "enter occupied blocks" and "enter occupied routes" should not be ticked.
  • "train may stay in start block" can be ticked. If ticked, if the schedule can't start immediately (e.g. if its path is blocked) it will start when it can.

 

Using This Site

Searching

The web site can be searched: type a search term (e.g. "DAC10") into the search box on the right hand side of the header, and hit enter. the search engine will find words matching the search string in the main body of the site, but it won't search attached documents (e.g. the product manuals).

"Read More"

Many articles are displayed one after the other. some are quite short, and say "read more" at the bottom. Click that to read the remainder of the article.